Plan ahead
Scheduled delivery is intended for work where the site can agree an arrival window in advance.
For contractors and construction teams
BuildQuick is developing a way to coordinate compatible material deliveries from participating suppliers. The goal is fewer separate arrangements and a clearer picture of what is arriving at your site.
Arrival-window concept
An agreed period for arrival.
Readiness and handling still come first.
You may still buy materials directly from different suppliers. The delivery model is intended to coordinate suitable orders into a shared transport plan, while each supplier keeps its own sale and invoice. A shared arrival depends on timing, material compatibility, vehicle capacity, and access at the jobsite.
Scheduled delivery is intended for work where the site can agree an arrival window in advance.
The proposed express option is for jobs needing closer coordination. Availability, pickup readiness, and operating conditions must be checked before accepting the request.
Heavy, oversized, or equipment-dependent loads need an appropriate vehicle and an agreed unloading plan. Tell the team about those requirements early.
Prepare an accurate address, a named receiving contact, safe vehicle access, and a clear unloading arrangement. Flag road restrictions, crane bookings, height limits, and any time when the site cannot receive materials. These details determine whether a delivery plan is practical.
Commercial delivery booking is not open through this website. BuildQuick is in development and preparing a planned pilot.
The initial focus is delivery coordination. A later ordering layer is part of the roadmap; this website is not a materials marketplace.
No. The operating plan must account for readiness, timing, load compatibility, equipment, and site access. Some work may require a separate arrangement.
Coordinate the receiving period with site access, equipment bookings and the person accepting the load. Tell the team about restrictions before a transport plan is accepted.
A changed address, blocked approach or unavailable unloading equipment can affect the whole delivery arrangement. The pilot workflow will define how changes are raised and confirmed.
Check the delivery against the agreed documentation and record visible discrepancies through the accepted process. Each supplier’s material-sale documents remain separate.
A useful delivery brief is specific about physical conditions. Consider the approach road, turning space, unloading location, overhead restrictions and the point where responsibility changes hands. These details help determine the appropriate vehicle and whether coordinated transport is practical.
Review the planned pilot and the kinds of receiving arrangements it will consider. Prepare a summary of your delivery needs for a future discussion; enquiry collection is not open yet.
A practical starting point
Review the information needed before discussing a delivery arrangement. This checklist stays on this page and does not submit information.
Your preparation checklist
Use this local checklist to review the information a delivery discussion needs. No details or selections are saved.
Completing this checklist does not establish load suitability or confirm service availability. Actual acceptance requires an operating review.